Illinois State University

Renovations to the 5th and 6th-floor public restrooms within Milner Library Work includes, but is not limited to: Interior work including paint, wall and floor tile. Metal framing and drywall. Replacement of existing domestic water and waste piping. Installation of new toilet partitions and accessories. Revisions to the existing electrical systems including fire alarm.